从宝珠寺水电站工程建设实践谈投资控制

来源 :四川水力发电 | 被引量 : 0次 | 上传用户:hnnydbw2007
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
宝珠寺水电工程建设历经计划经济和市场经济两个时期,长达10 年的时间是在计划经济体制下由施工单位“自营”建设,工期延长,导致工程总投资增加,特别是建贷利息和水库淹没补偿费成为电站投资控制的沉重包袱。随着水电建设管理体制改革的逐步深化,计划经济时期那种完全用设计概算管理投资的办法必须改变,水电建设项目业主在投资控制方面要真正体现业主负责制。 Baozhusi hydropower construction has gone through two stages of planned economy and market economy. Up to 10 years time, it is constructed by the construction unit under the planned economic system. The construction period is prolonged, resulting in an increase of the total investment of the project, especially the interest of the construction loan And reservoir submergence compensation fees become a heavy burden of investment control of power plants. With the gradual deepening of the reform of the hydropower construction management system, the plan of completely managing the investment with design budget estimates during the planned economy period must be changed. Owners of hydropower construction projects should truly reflect the responsibility system of the owners in terms of investment control.
其他文献
期刊
针对结构光视觉传感器所组成的多视觉测量系统,本文提出一种直接线性转换全局定标法,把各传感器的模块坐标归结到一个统一的用户坐标中。该系统用于轿车白车身有关参数的快速检
期刊
期刊
会议
期刊
期刊
The influence of solvent (in its gaseous state) on the stability of crystallized organic compounds was investigated. Through two examples of studies on the soli
期刊
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.