Risk assessment of bridge schemes comparison in ecological landscape zone at the preliminary design

来源 :The 7th International Conference on Bridge Maintenance, Safe | 被引量 : 0次 | 上传用户:DotNetStu
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  In the preliminary design phase of the bridge,there are many uncertainties and unforeseen factors,such as site condition,design,construction technology,operating environment,the actual vehicle load and other aspects.Combined with the natural conditions of the site,project plan,functional requirements and the views of the Ministry of Transportation and regulations,the framework of risk assessment for bridges in ecological zones is proposed in this paper.Major risk factors,which are environmental risk,design risk,construction risk and operational management risk,are studies in the paper,which includes multi-level dynamic risk identification,quantification,analysis and evaluation,risk control.Safety risk assessment of Huanglong bridge,as an example,is studies in this frame of risk assessment in the preliminary design stage,which is useful for the relevant decision-making departments.
其他文献
期刊
  As pointed out by Castel [1] in case the reinforcement is corroded,the reducing of reinforcement area and the decreasing of bond strength and rigidity betwe
会议
  Raising and escalating concern in the bridge scour issue recently comes of extreme weather and population increment.Bridge damage caused by scour is even mo
会议
我把嘴里最后一口牙膏泡沫吐出来的时候,又看了一眼挂在洗衣水泥池子上面的“扯历”.这样的一本“扯历”,放在任何一个稍微发达的地区大概都可以看作是一种史前遗迹,它是我妈
期刊
期刊
期刊
  Modem slender structures are subjected to high stress ranges when subjected to live load,hence higher vulnerability to fatigue failure can be assumed.Struct
会议
  As a relatively new structural performance indicator,risk has been gradually paid more attention in recent decades.Different from other commonly used struct
会议
期刊
期刊