Fatigue design of CFRP strengthened welded steel connections

来源 :The 7th International Conference on Bridge Maintenance, Safe | 被引量 : 0次 | 上传用户:whbin139
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  Application of carbon fiber reinforced polymer(CFRP) composites in steel structures has attracted increasing research interests during the last decade.The fatigue performance of welded steel connections has been generally improved by adhesively CFRP bonding.This paper tends to propose fatigue design of welded steel connections with CFRP strengthening.The key parameters contributing to the improvement of the fatigue performance are considered,including CFRP system (sheet or plate),with/without prestressing,CFRP/steel stiffness ratio,and strengthening configurations (bond width/bond locations).
其他文献
  Prosperity and quality of life of our modem society is also based on a well-established road network for movement of goods and passenger traffic.Bridges are
会议
本文以2015年末的审计管理体制改革为观察点,以省级以下地方国有A股上市公司为研究对象,从全要素生产率的视角实证检验本次审计改革的效果.研究发现,审计改革提高了试点地区
  This is the first of two linked papers discussing the assessment and strengthening of Morshead Overpass,Burnley Viaduct,Yarra Bridge and Gardiners Creek Via
会议
一、为便利深入工作与充分发动人民直接管理政权,农村行政区划应实行小乡小区制。乡划的过大,乡以下势必又再形成一级,各项工作无法深入,各种民主制度皆将流于形式。区划的
选择正确的投资时机所谓债券交易时机,即是指债券的买进时机和卖出时机。债券价格上涨转为下跌期间都是卖出时机,债券下跌转为上涨期间都是买进时机,具体说来,卖出时机包括:
  The history about the modern bridges in Korea dates back over 100 years to when the first modem bridge was built over the Han River in 1900.However,the olde
会议
  The VIPP are independent span viaducts with posttensioned precast concrete beams.This type of construction was largely developed between the years 1955 to 1
会议
本文基于2004年投资审批制度改革这一准自然实验,采用双重差分法实证检验了投资审批制度改革对僵尸企业出清的影响及内在机理.研究表明,投资审批制度改革能够使各行业僵尸企
  In China,there are over 60 long-span trussed combination arch bridge constructed from 1981.But now about half of them are damaged to some degree after over
会议
  Current design code is mainly focusing on conventional bridge types with span length up to about 200m.Live load model in design code was also developed for
会议