Singapore:The World's First Large Diameter SWRO Plant

来源 :2008亚太海水淡化与水再利用会议、亚洲科学理事会暨海洋科技与经济发展国际论坛 | 被引量 : 0次 | 上传用户:poco666
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This technical paper presents the engineering,procurement,construction,commissioning,and operations of a new SWRO desalination plant in Singapore.The desalination plant is the worlds first full-scale desalination plant to use large-diameter SWRO elements,and produces two customized grades of water for 10,000 m3/day of total production capacity:9,000 m3/day of high-grade service water,and 1,000 m3/day of domestic drinking water.The desalination plant was delivered as an engineer-procure-construct(EPC)contract,with CH2M HILL as the EPC contractor and PowerSeraya Ltd as the asset owner.The desalination plant is located on the site of PowerSerayas existing Pulau Seraya Power Station,a 3,000 MW power plant.CH2M HILL took advantage of the power station’S existing infrastructure of cooling water intake.discharge outfalls,and onsite tankage to CO-site the new desalination plant at the power station,resulting in an estimated 25 percent savings in capital costs for new infrastructure.The desalination plant is located on Jurong Island,a unique cluster of the major oil,petrochemical,and specialty chemical industries of Singapore.The desalination plant features Granular Media Filtration(GMF)pretreatment and a two-pass RO system.The RO system was supplied by GrahamTek Singapore Pte Ltd,and is the first full-scale installation in the world using large-diameter RO elements..The GrahamTek RO technology uses 16-inch spiral wound RO elements,incorporated with a patented integrated flow distributor and electromagnetic field(EMF)device.The GrahamTek RO technology claims advantages over conventional RO systems of:(a)capability to desalinate poorer raw water quality;(b)operation at higher fluxes and reduced footptints;and(C)reducing the likelihood of membrane scaling and need of chemical addition for scale control of sparingly soluble salts.The authors will present their experiences gained through the EPC,commissioning,and operations of this unique and innovative large-diameter SWRO plant.
其他文献
设计了一种采用分级变频方法的新型软起动控制器[1],在降压的同时实现有级变频。并利用Matlab对分级变频起动过程进行了仿真,论证了运用分级变频起动不仅可以减小电流冲击,而且
随着电力负荷的迅速增长,城市电网建设正如日中天.由于城市电网规模不断地扩建和延伸,受城区规划、环保和场地等条件制约,市区变电所越来越多地采用电缆馈线,以致10kV系统单
会议
在配网管理的工作中逐步发现了一些影响供电可靠性的主要原因,分别从管理、设备、网架、自动化程度等方面,并且就这些方面提出了八项整改措施,通过整改一定会提高配网的供电
针对目前及330kV吉祥变、110kV河南、泽库变投运后,康杨电站及河南地区小水电并网后,黄化电网的330kV吉祥变,110kV李家峡、保安、隆务、公伯峡等变电站主变压器由降压变变为
会议
提出了一种二阶近似的轮胎偏滚力学特性模型.以该模型为基础,研究了轮胎偏滚刚度对飞机机轮摆振的影响.结果表明,轮胎偏滚刚度是影响飞机机轮摆振的重要参数.“,”We present
语境一词,语指语言,境指环境,即语言环境。语境包括语言语境和非语言语境。每一个单词的不同含义依存于不同的语境中。在语境下教授词汇,有利于提高学生的词汇运用能力和记忆
通过大量的调查和研究,对电网的实际倒闸操作和事故处理所涉及到的各种情况进行分类,对调管线路的停送电操作进行优化和改进,建立新型模式下更合理、更科学、更安全的操作方
BY IN SITU HYBRIDIZATION HISTOCHEMISTRY, THE CHANGES OF PREPROTACHYKININ (PPT) MRNA EXPRESSION WERE EXAMINED IN THE NEURONS OF ADJACENT THORACAL DORSAL ROOT GAN
在我国未来房地产税制改革中,将房地产计税依据由现行的按房地产原值改为按照房地产的市场评估值为计税依据,这样房地产价格评估管理将是未来房地产税征收管理的核心。通过对
随着电力系统互联规模的不断扩大,发电和输电的经济性和可靠性得到了进一步提高.然而多个地区之间的多重互联又诱发出电力系统许多新的动态稳定问題,使系统失去稳定性的可能
会议