STUDY On the Settlement Characteristics of CFG Pile-plate Composite Foundation of High-speed Railway

来源 :高速铁路、线路工程设计理论、施工及养护技术国际学术会议 | 被引量 : 0次 | 上传用户:Matousec
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Field tests of settlement characteristics were carried out on the CFG pile-plate composite foundation on Beijing-Xuzhou section of Beijing-Shanghai high-speed railway.The settlements of the piles and soil between piles,the subgrade and the underlying stratum were obtained and analyzed.The results show that the settlement-time dependencies experiences three phases-rapid development phase,stable development phase and stable phase,therefore,surcharge preloading is necessary to reduce the settlement after construction.The finite element software Plaxis is applied to calculate the deformation of the pile top and the soil between piles at the embankment center as well as the settlement of CFG pile reinforcement area and the underlying stratum under surcharge preloading.The calculating results and the field test results were comparatively and comprehensively analyzed and the settlement characteristics of pile-plate composite foundation under high embankment are concluded.
其他文献
  本文主要运用偏离一份额分析法对环渤海各省市人境旅游市场发展状况以及10个主要客源市场的增长性和衰退性进行分析。通过对环渤海地区各省市人境旅游客源市场结构的分析
  本文分析了东北亚集装箱港口竞争趋势,东北亚集装箱港口竞争中光阳港的优劣势及发展定位,提出了东北亚集装箱港口竞争中光阳港的策略选择。
In this paper,based on LiYao test section of Beijing-Shanghai high-speed rail project,make a study on field test technology of CFG pile composite foundation in
The settlement after construction controlling of subgrade is a crucial issue on designing of high speed railway.Based on the experimental study at home and abro
In this paper three-dimensional seismic dynamic responses of tunnel portal are modeled by FLAC.Seismic response rules of tunnel lining and rock mass are acquire
  金融危机以来,在国际海运形势低迷、全国港口吞吐量日趋下滑的严峻形势下,山东省青岛港却保持持续增长。青岛港之所以取得如此可喜乃至惊人的成就,主要有以下几条原因:多方协
  文章分析了金融危机对船市的影响,撇开金融危机所带来的影响探讨中国船舶制造业的现状,可以看出在近年来船舶业虚荣增长背后所掩盖的种种弊病。探讨了中国船舶制造业的出路
  建设社会主义新农村,是我们党从全面建设小康社会全局出发作出的重大决策,集中体现了我们党现阶段解决三农问题的新思路。分析了新渔村建设存在的主要问题   ,休闲渔业的
Xikema Tunnel,with a length of 2812 m,is the longest tunnel along of high Shanghai-Beijing speed railway.The surrounding rock of the tunnel is mainly Cambrian L
  现有的研究成果已经肯定了海洋产业对经济增长的积极作用,但是这些大都集中于定性分析,难以科学反映海洋产业发展与经济增长之间的关联关系。为此,本文引人VAR模型,借助脉冲