论文部分内容阅读
阐述了本钢二烧在现有条件下,通过改进工艺,改造设备,引进技术,使烧结矿质量提高,以满足本钢新建4747m3高炉对烧结矿质量更高的要求。
Described the two under the existing conditions of the BX steel, through the improvement of technology, transformation of equipment, the introduction of technology to improve the quality of sinter to meet the new 4747m3 Bengang blast furnace of higher quality sinter requirements.