徐州某火电厂水泵房建成于20世纪70年代末期,由于服役时间较久,构筑物已有一定劣化、破损。考虑到水泵房后续使用的安全性,对该构筑物主体结构的工作环境、外观质量、钢筋混凝土构件的混凝土碳化深度及抗压强度、钢筋分布和保护层厚度、钢筋锈蚀等进行了全面的检测,并依据相应的检测结果及规范对其主体结构进行了设计复核。在此基础上,对水泵房主体结构的安全性进行了综合评定,并提出了相应的修复加固与维护建议,可供同类工程参考。
Xuzhou a thermal power plant pump house built in the late 1970s, due to longer service life, the structure has been a certain deterioration, damage. Taking into account the safety of the subsequent use of the pump house, the structure of the main structure of the work environment, the appearance of quality, reinforced concrete concrete depth and compressive strength of concrete, steel distribution and protective layer thickness, corrosion of steel conducted a comprehensive test, And based on the corresponding test results and specifications of the main structure of the design review. On this basis, the safety evaluation of the main structure of the pump house was comprehensively evaluated, and corresponding suggestions for restoration, reinforcement and maintenance were put forward for the reference of similar projects.