超高层建筑由于高度大,基底桩底的附加应力大,需选择较深较好的土层作为桩基持力层,对于软土地基需穿越较厚砂层的情况下,通常会选用钻孔灌注桩。超深钻孔灌注桩的实际单桩承载力及施工中桩底清淤效果是设计中必须考虑的问题。本文通过苏州东方之门桩基持力层的选择及是否采用后注浆工艺的试验比较,表明适合的桩基持力层及施工工艺对超高层建筑桩基设计的重要性,以供其它同类工程参考。
Due to the large height and the additional stress at the bottom of pile foundation, the super high-rise building needs to choose the deeper and better soil as the pile supporting layer. For the case where the soft soil foundation needs to cross the thick sand layer, drilling Pouring pile. The actual single-pile bearing capacity of ultra-deep bored cast-in-situ piles and the dredging effect at the bottom of the pile during construction are issues that must be considered in the design. In this paper, through the selection of the pile-holding layer of Suzhou Eastern Gate and the comparison of whether the post-grouting process is adopted, it shows the importance of the suitable pile supporting layer and construction technology to the pile foundation design of super-tall buildings for other similar Engineering reference.